Screed Concrete and Floor Levelling Systems: Types, Thickness and Applications
Screed is a level or sloped cement-based layer installed over a concrete slab to create the correct base for the final floor finish. It is generally non-structural: the slab carries the building load, while the screed and underlayment system corrects levels, builds thickness, forms falls and prepares the surface for tiles, stone, vinyl, LVT, carpet, wood or other finishes.
If the slab is the foundation of a floor, the screed is its finishing plaster. And like plaster, when it is done badly, everything on top of it shows the problem: cracked tiles, hollow sounds, water pooling in the wrong corner of the bathroom.
Screed vs concrete: what’s the difference?
On Indian sites, “screed concrete” is often used loosely for any levelling layer. Technically, screed and concrete are different materials doing different jobs.
| Concrete slab | Screed | |
|---|---|---|
| Purpose | Structural: carries loads | Levelling: creates a flat, sloped, smooth finish |
| Mix | Cement, sand, coarse aggregate (stone chips), water | Cement and sand (or a pre-blended screed mix), water; little or no coarse aggregate |
| Typical thickness | 100–200 mm and more | 25–75 mm |
| Surface | Uneven, may have high and low spots | Flat and true, ready for finishes |
| Finish layer? | No | Yes: the base tiles and stone sit on |
Why screed matters for tiles
Tile adhesive is applied in a thin bed of a few millimetres. It cannot hide a slab that is 15 mm out of level. A good screed:
- Levels the floor, so large tiles sit flat without lippage or hollow spots.
- Creates falls in bathrooms, balconies and terraces, so water drains towards the outlet.
- Covers services like pipes and conduits laid on the slab.
- Provides a sound surface for adhesive to grip.
Most tile failures that appear a year after handover start here. Our guide on surface preparation before tile installation explains the checks a screed should pass before tiling.
Types of screed
By how it is laid
- Bonded screed: bonded directly to a clean, prepared slab with a bonding slurry or primer. Thinnest option, best where floor height is limited.
- Unbonded screed: laid over a separating layer such as a polythene sheet or damp-proof membrane. Needs to be thicker because it is not supported by the bond.
- Floating screed: laid over insulation or an acoustic mat. Used where sound or heat insulation is needed, for example over MYK LATICRETE sound control underlays in apartments and hotels.
By material and performance requirement
- Traditional sand-cement screed: mixed on site, commonly using cement and graded aggregates. It is economical, but performance depends heavily on proportioning, water control, compaction and curing.
- LATASCREED 100 (LS100) engineered screed: used where the floor needs thickness build-up, major level correction and a strong, consistent screed base. Correct aggregate selection, batching, mixing, placing and compaction remain essential.
- L226 with L3642 screed system: a liquid-additive route for upgrading site-produced screed where a project specification requires the L226 + L3642 combination. Use only the approved dosage, mixing sequence and coverage from the current MYK LATICRETE technical data and project method statement.
- NXT Level Flow self-levelling underlayment: a high-flow, pourable or pumpable layer used after suitable substrate preparation and priming to correct minor undulations and create a smooth, flat surface before resilient or other sensitive floor finishes.
Fast-track system selection: use LS100 or the specified L226 + L3642 screed system for body, thickness and level correction; use NXT Level Flow for the final fine-levelling layer. These products are complementary, not direct substitutes.
Thickness depends on the type of screed and how it is laid. Common guidance (based on BS 8204) is:
| Screed type | Typical minimum thickness |
|---|---|
| Bonded | 25–40 mm |
| Unbonded | 50 mm |
| Floating (homes) | 65 mm |
| Floating (commercial, heavy loads) | 75 mm |
| Self-levelling underlayment | 3–10 mm (per product instructions) |
Thinner than this, and a sand-cement screed is likely to crack or break up. Much thicker, and it takes far longer to dry and adds unnecessary load. A traditional screed dries at roughly 1 mm per day for the first 40 mm under good conditions, so a 50 mm screed may need around two months before moisture-sensitive finishes.
Falls and slopes in wet areas
Bathrooms, balconies and terraces need a gentle, consistent slope towards the drain, commonly around 1:100 (10 mm per metre). The fall must be in the screed, not created with extra adhesive under the tiles. Waterproofing such as LATICRETE® Hydro Ban® is then applied over the sloped screed, before tiling. For thick-bed stone installations, LATICRETE® 9237, a roller-applied liquid membrane, is the recommended choice. Read more in why under-tile waterproofing matters.
Common screed problems and what causes them
| Problem | Likely cause |
|---|---|
| Shrinkage cracks | Too much water in the mix, rapid drying, no curing |
| Hollow-sounding screed | Poor bond to the slab, dirty slab surface |
| Dusty, weak surface | Over-watered mix, poor compaction |
| Curling at edges | Uneven drying between the top and bottom |
| Water ponding on balcony | Incorrect falls |
Each of these transfers straight to the tiles: cracks telegraph through, hollow screed makes hollow tiles, and dusty surfaces stop adhesive from bonding.
MYK LATICRETE screed solutions
Which system should be used?
| Site condition / need | Recommended system | Typical role | Critical control |
|---|---|---|---|
| Major level difference or screed build-up | LS100 | Engineered screed base for thickness, strength and level correction | Aggregate grading, ratio, water, compaction and curing/protection |
| Project specifies liquid-modified site screed | L226 + L3642 | Approved additive system for site-produced screed | Use current TDS dosage and mixing sequence; verify cost and coverage for actual thickness |
| Minor undulations; smooth finish required | NXT Level Flow over primer | Fine levelling underlayment before vinyl, LVT, carpet, wood or other sensitive finishes | Sound substrate, crack/joint treatment, primer, measured water, continuous pour and protection |
| Major correction plus premium final finish | LS100 or L226 + L3642, then primer + NXT Level Flow | Complete floor-preparation system | Do not apply SLU over weak, wet, dusty or moving substrates |
Full build-up flow: RCC slab / sound substrate → engineered screed layer (LS100 or approved L226 + L3642 system) → curing and readiness checks → primer → NXT Level Flow → final floor finish.
Thin-levelling flow: sound, stable substrate → preparation and primer → NXT Level Flow → final floor finish.
MYK LATICRETE floor preparation solutions
Select the system by the depth of correction and the required final finish. LS100 is the primary engineered screed option for thickness build-up and major level correction. Where the approved project specification calls for a liquid-modified site screed, L226 with L3642 provides the specified additive route. After the screed is sound, cured, dry and properly prepared, NXT Level Flow can be applied over the correct primer to deliver a smooth, flat underlayment for premium finishes.
Recommended full build-up: RCC slab or sound substrate → LS100 engineered screed, or the approved L226 + L3642 screed system → substrate checks and primer → NXT Level Flow → final flooring. For minor undulations on a strong, stable base, the thin-levelling route is: prepared substrate → primer → NXT Level Flow → final flooring.
Do not use tile adhesive to compensate for major floor variation. Confirm the required thickness, substrate strength, moisture condition, movement joints, primer, mixing water, application environment and floor-covering installation time against the latest product TDS and an approved site mock-up.
Frequently asked questions
1. What is screed concrete used for?
Screed is laid over a concrete slab to create a flat, level and correctly sloped surface for tiles, stone and other floor finishes. It can also cover pipes and conduits, and sit over insulation or acoustic mats.
2. What is the difference between screed and concrete?
Concrete contains coarse aggregate and is structural. Screed is a finer cement-and-sand mix, laid thinner, and its job is to level and finish the floor, not carry structural load.
3. What is the standard thickness of floor screed?
The required thickness depends on whether the layer is bonded, unbonded or floating and on the selected product. Use LS100 or the approved L226 + L3642 screed system for build-up within the applicable TDS limits. Use NXT Level Flow as a fine-levelling underlayment at the project-approved thickness, not as a replacement for deep screed correction.
4. How long does screed take to dry before tiling?
Drying and readiness depend on thickness, site temperature, humidity, ventilation, substrate moisture and product selection. Do not rely only on elapsed days. Follow the current TDS, verify moisture where the final finish is moisture-sensitive, and obtain mock-up or site approval before covering.
5. Why does screed crack?
Most often because of too much water in the mix, fast drying in heat or wind, lack of curing, or insufficient thickness. Engineered, self-curing screeds with controlled shrinkage reduce this risk.
6. What ratio is used for floor screed?
Traditional site-mixed screed is commonly 1 part cement to 3–5 parts sand. Pre-blended screeds remove the guesswork by controlling the mix in the factory.
7. When should LS100 and NXT Level Flow be used together?
Use LS100 when the slab needs substantial level correction or thickness build-up. After the screed is ready and primed as specified, use NXT Level Flow to produce the smooth, flat surface required for sensitive or premium flooring. The sequence is build the body first, then create the finish.
8. Where do L226 and L3642 fit in the system?
L226 and L3642 are used together only where the approved project specification and current MYK LATICRETE technical documentation require that liquid-additive screed route. Treat it as an alternative screed-build-up method, followed by primer and NXT Level Flow when fine levelling is required.
9. Can tiles be laid directly on screed?
Yes, once the screed is fully cured, dry, clean and level. Fix the tiles with a suitable tile adhesive rather than a thick cement bed, so the screed’s flatness carries through to the finished floor.